{
  "schemaVersion": 1,
  "reviewedAt": "2026-10-09",
  "compositionUpdatedAt": "2026-10-06",
  "compositionSource": "https://www.ncsl.org/about-state-legislatures/state-partisan-composition",
  "governorSource": "https://www.nga.org/governors/",
  "records": [
    {"id":"alabama","governor":"Kay Ivey","governorParty":"R","houseParty":"R","senateParty":"R","stateSignal":"Open incentive path with new cost-protection laws and 2027 abatement limits.","localSignal":"Local pauses include Baldwin County; state access does not settle rezoning.","watchpoint":"Separate the grant date, local land-use vote and PSC contract review. Confirm each before counting state support as a schedule advantage.","evidenceIds":["alabama-context-1","alabama-context-5"]},
    {"id":"arizona","governor":"Katie Hobbs","governorParty":"D","houseParty":"R","senateParty":"R","stateSignal":"New incentive certifications are paused through June 2029. That law is an incentive restriction, not a statewide development ban.","localSignal":"Tucson, Phoenix, Chandler and Pinal County have different approval records.","watchpoint":"Track the incentive certificate separately from municipal zoning and utility capacity. A statement opposing a statewide ban does not approve a specific site.","evidenceIds":["arizona-incentive","arizona-context-1","arizona-context-6","arizona-context-7"]},
    {"id":"arkansas","governor":"Sarah Huckabee Sanders","governorParty":"R","houseParty":"R","senateParty":"R","stateSignal":"Incentives expanded in 2025. The retained moratorium resolution was proposed and non-binding.","localSignal":"Local moratoriums, board approvals and a Clarksville bond election remain separate questions.","watchpoint":"Determine whether the project needs a discretionary board vote or public financing vote. Neither follows automatically from the state incentive program.","evidenceIds":["arkansas-context-1","arkansas-context-4","arkansas-context-5"]},
    {"id":"georgia","governor":"Brian Kemp","governorParty":"R","houseParty":"R","senateParty":"R","stateSignal":"Equipment relief remains in the retained review; a 2026 repeal bill passed the Senate but stalled in the House.","localSignal":"County moratoriums, divided rezoning votes and litigation show site-specific opposition.","watchpoint":"Confirm the final legislative disposition and the parcel-level approval record. A vote in one chamber cannot be budgeted as enacted repeal.","evidenceIds":["georgia-context-1","georgia-context-3","georgia-context-4"]},
    {"id":"illinois","governor":"JB Pritzker","governorParty":"D","houseParty":"D","senateParty":"D","stateSignal":"New incentive applications stopped July 1. The retained POWER Act proposal is separate from the effective application pause.","localSignal":"Moratoriums and approved campuses coexist in different jurisdictions.","watchpoint":"Check existing-award coverage and the local application window. Separate proposed statewide conditions from the rules currently controlling the site.","evidenceIds":["illinois-incentive","illinois-context-3","illinois-context-4"]},
    {"id":"indiana","governor":"Mike Braun","governorParty":"R","houseParty":"R","senateParty":"R","stateSignal":"The equipment and utility incentive path remains open in the retained review, with project cost guarantees and local benefit-sharing conditions.","localSignal":"County and city moratoriums can prevent a site advancing despite state incentives.","watchpoint":"Obtain the local application status and required approvals before pricing the award. State and local political decisions can move in different directions.","evidenceIds":["indiana-incentive","indiana-context-2","indiana-cost-guarantee","indiana-context-5"]},
    {"id":"kentucky","governor":"Andy Beshear","governorParty":"D","houseParty":"R","senateParty":"R","stateSignal":"Statewide incentives coexist with a governor energy-plan requirement intended to protect other ratepayers.","localSignal":"Louisville, Scott County and Lexington have separate pause and extension records.","watchpoint":"Align the energy plan and utility contract with the local vote calendar. Divided state government does not remove executive or local approval requirements.","evidenceIds":["kentucky-incentive","kentucky-context-4","kentucky-context-5"]},
    {"id":"louisiana","governor":"Jeff Landry","governorParty":"R","houseParty":"R","senateParty":"R","stateSignal":"LED describes an invitation-only transition and an agency-supported commitment process.","localSignal":"New Orleans restrictions and parish-level siting rules differ.","watchpoint":"Establish who can issue the state invitation and which parish approvals remain. A favorable infrastructure process is separate from land-use permission.","evidenceIds":["louisiana-incentive","louisiana-context-3","louisiana-context-5"]},
    {"id":"mississippi","governor":"Tate Reeves","governorParty":"R","houseParty":"R","senateParty":"R","stateSignal":"State incentives remain open in the retained review, subject to investment and jobs tests.","localSignal":"Jackson has a moratorium; other project disputes have their own local and court records.","watchpoint":"Identify the decision-making municipality, county and utility. Treat state incentive eligibility and a contested local rezoning as separate milestones.","evidenceIds":["mississippi-incentive","mississippi-context-5"]},
    {"id":"nevada","governor":"Joe Lombardo","governorParty":"R","houseParty":"D","senateParty":"D","stateSignal":"New abatements need a binding Community Support Commitment before GOED board consideration. Proposed 2027 changes are separate.","localSignal":"Reno and several counties have pauses or restrictions; water standards are location-specific.","watchpoint":"Confirm the commitment process and local water conditions. Track the legislative proposal through enactment rather than assuming it has already closed the current path.","evidenceIds":["nevada-incentive","nevada-context-2","nevada-context-4"]},
    {"id":"north-carolina","governor":"Josh Stein","governorParty":"D","houseParty":"R","senateParty":"R","stateSignal":"Electricity relief was repealed; equipment relief remains in the retained review. A proposed end to new applications is a different action.","localSignal":"County and municipal moratoriums are independent; an existing project can present a vested-rights dispute.","watchpoint":"Separate the enacted electricity change, the equipment certificate and any proposed repeal. Obtain the local ruling on the project rather than assuming grandfathering.","evidenceIds":["north-carolina-incentive","north-carolina-context-2","north-carolina-context-5"]},
    {"id":"ohio","governor":"Mike DeWine","governorParty":"R","houseParty":"R","senateParty":"R","stateSignal":"The governor paused new exemption proposals while a legislative committee reviews data-center growth. No fixed end is stated.","localSignal":"The retained local review reports numerous moratoriums and effective bans.","watchpoint":"Check the Tax Credit Authority application path and the specific city or township. Incentive reopening would not automatically reopen a local zoning process.","evidenceIds":["ohio-incentive","ohio-context-5"]},
    {"id":"oklahoma","governor":"Kevin Stitt","governorParty":"R","houseParty":"R","senateParty":"R","stateSignal":"Equipment incentives remain open while large-load cost rules and a future cooling-water restriction add conditions.","localSignal":"Municipal and tribal governments have distinct moratoriums and bans.","watchpoint":"Confirm land status and the government with jurisdiction before reading the state label. A state incentive does not override a tribal land restriction.","evidenceIds":["oklahoma-incentive","oklahoma-large-load-law","oklahoma-context-4","oklahoma-context-5"]},
    {"id":"pennsylvania","governor":"Josh Shapiro","governorParty":"D","houseParty":"D","senateParty":"R","stateSignal":"Equipment relief requires a GRID consent order. The retained executive order ties certain DEP permits to local approvals.","localSignal":"Municipal decisions and zoning challenges can control whether state permitting advances.","watchpoint":"Secure the local approval record and consent-order pathway. Split legislative control does not mean executive agency processes stand still.","evidenceIds":["pennsylvania-incentive","pennsylvania-dep-hold","pennsylvania-context-5"]},
    {"id":"south-carolina","governor":"Henry McMaster","governorParty":"R","houseParty":"R","senateParty":"R","stateSignal":"Incentive certification remains available before 2032, with investment and employment conditions. Large-load obligations remain separate.","localSignal":"Several county moratoriums and project-size rules appear in the retained research.","watchpoint":"Obtain the county ordinance and its size definitions, then the utility contract. State certification cannot substitute for county acceptance.","evidenceIds":["south-carolina-incentive","south-carolina-context-5"]},
    {"id":"tennessee","governor":"Bill Lee","governorParty":"R","houseParty":"R","senateParty":"R","stateSignal":"Equipment relief remains open; a suggested three-year incentive pause is a planned 2027 bill, not an enacted pause.","localSignal":"Nashville restrictions, Knoxville's moratorium and a pending Memphis vote differ.","watchpoint":"Recheck the actual local vote and the next legislative filing. A suggested statewide pause and an adopted local pause have different practical effects.","evidenceIds":["tennessee-incentive","tennessee-pause-proposal","tennessee-context-1","tennessee-context-6"]},
    {"id":"texas","governor":"Greg Abbott","governorParty":"R","houseParty":"R","senateParty":"R","stateSignal":"The targeted October 9 review confirms reported ERCOT and TCEQ holds and the effective interconnection funding rule. Incentive repeal remains a proposal.","localSignal":"Hill County rescinded its moratorium after a developer lawsuit; that local change is separate from the state holds.","watchpoint":"Keep energization, environmental permitting and tax certification on separate schedules. Audit or reporting deadlines are not automatic reopening dates.","evidenceIds":["texas-ercot-hold","texas-tceq-hold","texas-security","texas-incentive-repeal","texas-context-6"]},
    {"id":"utah","governor":"Spencer Cox","governorParty":"R","houseParty":"R","senateParty":"R","stateSignal":"Equipment relief remains available in the retained review; limits on some local incentives start in May 2027.","localSignal":"Tooele County and Box Elder project litigation show different local approval risks.","watchpoint":"Read the statutory exception and local award terms before carrying an incentive into a later phase. Resolve the parcel-specific legal and approval record.","evidenceIds":["utah-incentive","utah-local-incentives","utah-context-5"]},
    {"id":"virginia","governor":"Abigail Spanberger","governorParty":"D","houseParty":"D","senateParty":"D","stateSignal":"Equipment relief remains available, while the retained executive order restricts state site-readiness and fast-track assistance for large projects.","localSignal":"Loudoun and Prince William are changing by-right and discretionary approval paths.","watchpoint":"Establish whether the site needs a special approval and whether state assistance applies. Distinguish loss of state assistance from a blanket construction ban.","evidenceIds":["virginia-incentive","virginia-context-5","virginia-context-6"]},
    {"id":"wisconsin","governor":"Tony Evers","governorParty":"D","houseParty":"R","senateParty":"R","stateSignal":"Qualified incentives remain open in the retained statute. A candidate pledge to repeal them is a campaign position, not enacted law.","localSignal":"County moratoriums and pending city proposals need individual checks.","watchpoint":"Track any actual repeal bill and the local ordinance separately. Preserve the award documents and identify changes affecting expansions or later purchases.","evidenceIds":["wisconsin-incentive","wisconsin-context-3","wisconsin-context-5"]}
  ]
}
