Project facts
| Address | 1010 WEST MARIETTA, Atlanta, GA |
|---|---|
| Jurisdiction | City of Atlanta, GA |
| Operator named in the records | Meta, QTS |
| Furthest step on record | Building permit issued, October 14, 2025 |
| Capacity stated in a filing | None stated |
| Floor area stated | None stated |
| Site area stated | None stated |
| Records on file | 8, from April 2, 2024 to October 14, 2025 |
Records on file
| Filed | Type and status | What the record says | Source |
|---|---|---|---|
| Building permit Closed | META-QTS Level 1 Advantage fire is to plug off existing concealed heads and leave uprights to remain above | Record | |
| Building permit Closed | META-QTS Level 2 Advantage fire is to plug off existing concealed heads and leave uprights to remain above | Record | |
| Building permit Issued | META-QTS Level 3 Advantage fire is to plug at existing concealed head location and leave uprights above to remain | Record | |
| Building permit Closed | QTS ATL DC3 DH 1200 DATA HALL FIT OUT Low voltage cabling for switchgear, electrical panels, control panels, and WAPs that are associated with the data hall 1200 buildout and it’s supporting utility infrastructure. | Record | |
| Building permit Closed | QTS ATL DC3 DH 2200 DATA HALL FIT OUT LOW VOLT Low voltage cabling for switchgear, electrical panels, control panels, and WAPs that are associated with the data hall 2200 buildout and it’s supporting utility infrastructure. | Record | |
| Building permit Closed | QTS ATL DC3 DH 2100 DATA HALL FIT OUT LOW VOLT Low voltage cabling for switchgear, electrical panels, control panels, and WAPs that are associated with the data hall 2100 buildout and it’s supporting utility infrastructure. | Record | |
| Building permit Closed | #923011-QTS ATLANTA DH1200 INSTALL NEW SPRINKLER SYSTEM IN A 2 STORY DATA CENTER. THIS PERMIT COVERS THE DATA HALL 1200 FIT OUT CEILING AREA ONLY + THE DRY PENDENT FLEXHEADS LOCATED IN THIS AREA. | Record | |
| Building permit Closed | #923011-QTS ATLANTA DH1100 INSTALL NEW SPRINKLER SYSTEM IN A 2 STORY DATA CENTER. THIS PERMIT COVERS THE DATA HALL 1100 FIT OUT CEILING AREA ONLY + THE DRY PENDENT FLEXHEADS LOCATED IN THIS AREA. | Record |
Every row comes from a public permit, air-quality or planning record, linked to its source. A permit shows that work was proposed or approved. It does not show that space is available or that a building is finished. Capacity figures carry the basis the filing gives.
Cite this page
Data Center Scouts, "Meta and QTS data center at 1010 West Marietta, Atlanta, GA," https://datacenterscouts.com/data-center-projects/georgia/1010-west-marietta-atlanta/, updated October 9, 2026. Source records are linked on the page. Journalists and researchers are welcome to use this data with a link back.
All Georgia projects · Latest notable filings · Project tracker