Every public record we hold for this address, newest first, with a link to the original document. Last change on record: December 26, 2013.

Project facts

Address175 W JACKSON BLVD, Chicago, IL
JurisdictionCity of Chicago, IL (Cook County)
Operator named in the recordsNot named. The filer is usually a contractor, engineer or single-purpose company.
Furthest step on recordBuilding permit issued, January 6, 2014
Capacity stated in a filingNone stated
Floor area statedNone stated
Site area statedNone stated
Records on file3, from October 12, 2006 to December 26, 2013

Records on file

FiledType and statusWhat the record saysSource
Building permit
Building permit issued
EXTENDING A NEW 175-AMP, 480-VOLT FEED FROM THE 13TH FLOOR ELECTRICAL CLOSET TO THE 16TH FLOOR REGIONAL TRANSPORTATION AUTHORITY DATA CENTER. INSTALLING NEW 20 & 30-AMP OUTLETS AND 50-AMP POWER TO TWO UPS'S.
Applicant: ALL TECH ENERGY, INC.
Record
Building permit
Building permit issued
INSTALLATION OF DATA CENTER CABLING AND INFRASTRUCTURE.
Applicant: GIBSON ELECTRIC CO., INC.
Record
Building permit
Building permit issued
RENOVATION OF EXISTING DATA CENTER SPACE FOR SUITE 1700. -CONDITIONAL PERMIT PENDING FIELD INSPECTION
Applicant: LA MAR, CAROL GWENDOLYN
Record

Every row comes from a public permit, air-quality or planning record, linked to its source. A permit shows that work was proposed or approved. It does not show that space is available or that a building is finished. Capacity figures carry the basis the filing gives.

Cite this page

Data Center Scouts, "Data center project at 175 W Jackson Blvd, Chicago, IL," https://datacenterscouts.com/data-center-projects/illinois/175-w-jackson-blvd-chicago/, updated October 9, 2026. Source records are linked on the page. Journalists and researchers are welcome to use this data with a link back.

All Illinois projects · Latest notable filings · Project tracker

Have a requirement measured in megawatts?

Send us the load, the markets and the date you need it energized. A senior advisor replies within one business day with the questions that matter and a plan for the search.

Our advisory is free to tenants. We are compensated by the provider you choose, and we disclose that on every shortlist. How we are paid