Data center project at 2650 W Bradley Pl, Chicago, IL

Every public record we hold for this address, newest first, with a link to the original document. Last change on record: October 2, 2020.

Project facts

Address2650 W BRADLEY PL, Chicago, IL
JurisdictionCity of Chicago, IL (Cook County)
Operator named in the recordsNot named. The filer is usually a contractor, engineer or single-purpose company.
Furthest step on recordBuilding permit issued, October 2, 2020
Capacity stated in a filingNone stated
Floor area statedNone stated
Site area statedNone stated
Records on file2, from July 31, 2017 to October 2, 2020

Records on file

FiledType and statusWhat the record saysSource
Building permit
Building permit issued
REPLACE ONE CHILLER WITH ONE, 20 TON, AIR COOLED, SELF-CONTAINED, R410A, CARRIER CHILLER, LOCATED ON THE ROOF, AND SERVING A DATA CENTER.
Applicant: BRADLEY PLACE HOLDINGS LLC.
Record
Building permit
Building permit issued
INSTALL ONE 20 TON, AIR COOLED, SELF-CONTAINED, R410A, CARRIER CHILLER, AS A REDUNDANT SYSTEM FOR AN EXISTING DATA CENTER. THE CHILLER IS LOCATED ON THE ROOF AND SERVING WB GAMES TENANT SPACE. STAMPED PLANS PROVIDED.
Applicant: WARNER BROS ENTERTAINMENT INC.
Record

Every row comes from a public permit, air-quality or planning record, linked to its source. A permit shows that work was proposed or approved. It does not show that space is available or that a building is finished. Capacity figures carry the basis the filing gives.

Cite this page

Data Center Scouts, "Data center project at 2650 W Bradley Pl, Chicago, IL," https://datacenterscouts.com/data-center-projects/illinois/2650-w-bradley-pl-chicago/, updated October 9, 2026. Source records are linked on the page. Journalists and researchers are welcome to use this data with a link back.

All Illinois projects · Latest notable filings · Project tracker

Have a requirement measured in megawatts?

Send us the load, the markets and the date you need it energized. A senior advisor replies within one business day with the questions that matter and a plan for the search.

Our advisory is free to tenants. We are compensated by the provider you choose, and we disclose that on every shortlist. How we are paid