Project facts
| Address | 9999 HAMILTON BLVD, BREINIGSVILLE 18031-9300 |
|---|---|
| Jurisdiction | Pennsylvania (statewide; Philadelphia, Pittsburgh, the Lehigh Valley and the Route 202 corridor) |
| Operator named in the records | TierPoint |
| Furthest step on record | Operating |
| Capacity stated in a filing | None stated |
| Floor area stated | None stated |
| Site area stated | None stated |
| Records on file | 2, from date not stated to date not stated |
Records on file
| Filed | Type and status | What the record says | Source |
|---|---|---|---|
| Not stated | Air permit Operating | TIERPOINT TWO, LLC - TEKPARK FACILITY | Record |
| Not stated | Air permit Air permit on file | TIERPOINT TWO, LLC - TEKPARK FACILITY | Record |
Every row comes from a public permit, air-quality or planning record, linked to its source. A permit shows that work was proposed or approved. It does not show that space is available or that a building is finished. Capacity figures carry the basis the filing gives.
Cite this page
Data Center Scouts, "TierPoint data center at 9999 Hamilton Blvd, Breinigsville, PA," https://datacenterscouts.com/data-center-projects/pennsylvania/9999-hamilton-blvd-breinigsville/, updated October 9, 2026. Source records are linked on the page. Journalists and researchers are welcome to use this data with a link back.