Data center project at 12100 Samsung Blvd Bldg Fab2, Austin, TX

Every public record we hold for this address, newest first, with a link to the original document. Last change on record: July 22, 2021.

Project facts

Address12100 SAMSUNG BLVD BLDG FAB2, AUSTIN, TX 78754
JurisdictionCity of Austin, TX (Travis County)
Operator named in the recordsNot named. The filer is usually a contractor, engineer or single-purpose company.
Furthest step on recordWork finaled, July 28, 2022
Capacity stated in a filingNone stated
Floor area stated7,000 sq ft
Site area statedNone stated
Records on file4, from September 27, 2017 to July 22, 2021

Records on file

FiledType and statusWhat the record saysSource
Building permit
Final
FAB2 DATA CENTER EXP-PH2 - ADD 4 PANELS AND RECEPTACLES OUT OF THE FOUR PANELS IN DATA CENTER. ADD THREE 3 CRAC UNITS (A/C)
Applicant: JMEG, LP
Record
Building permit
Expired
Install feeders from a transformer to refeed two(2) panelboards rated at 400 ampere from a different power source. (FAB2 Simax Data Center)
Applicant: JMEG, LP
Record
Building permit
Final
Interior remodel to existing Office area and expand (existing) Data Center.
Applicant: Samsung Texas Construction (Main)
Record
Planning case
Approved
Interior remodel to existing Office area and expand (existing) Data Center.Record

Every row comes from a public permit, air-quality or planning record, linked to its source. A permit shows that work was proposed or approved. It does not show that space is available or that a building is finished. Capacity figures carry the basis the filing gives.

Cite this page

Data Center Scouts, "Data center project at 12100 Samsung Blvd Bldg Fab2, Austin, TX," https://datacenterscouts.com/data-center-projects/texas/12100-samsung-blvd-bldg-fab2-austin/, updated October 9, 2026. Source records are linked on the page. Journalists and researchers are welcome to use this data with a link back.

All Texas projects · Latest notable filings · Project tracker

Have a requirement measured in megawatts?

Send us the load, the markets and the date you need it energized. A senior advisor replies within one business day with the questions that matter and a plan for the search.

Our advisory is free to tenants. We are compensated by the provider you choose, and we disclose that on every shortlist. How we are paid