Project facts

Address1990 N STEMMONS FWY Dallas, TX 75207
JurisdictionDallas County, TX (City of Dallas)
Operator named in the recordsEquinix
Furthest step on recordWork finaled, May 20, 2025
Capacity stated in a filingNone stated
Floor area stated43,009 sq ft
Site area statedNone stated
Records on file3, from May 8, 2025 to June 18, 2025

Records on file

FiledType and statusWhat the record saysSource
Building permit
Inspection Phase
QTEAM INHOUSE THE SCOPE OF THIS PROJECT INCLUDES A 43,009 SF BUILDOUT ON THE FIRST FLOOR, 47,044 SF ON THE SECOND FLOOR, AND 5,438 SF ON THE THIRD FLOOR OF AN EXISTING FOUR STORY DATA CENTER, INCLUDING INTERIOR PARTITIONS, DOORS, CEILINGS, LIGHTING FIXTURES, MECHANICAL AND ELECTRICAL EQUIPMENT, TEN GENERATORS, GENERATOR DUNNAGE PLATFORMS, EXTERIOR STAIRS, AND MODIFICATIONS TO EXISTING STEEL DUNAGE PLATFORMS
Applicant: alex heolzli
Record
Building permit
Closed - Complete
QTEAM INHOUSE Construction of non-structural interior partitions on the third floor of an existing four-story data center building to enclose select areas. Work is limited to installation of walls, door, ceiling, and related components.
Applicant: Clune Construction Company, L.P.
Record
Building permit
Closed - Complete
QTEAM INHOUSE Interior fitout of an existing, unfinished electrical room on the second floor of a four-story data center building. Work is limited to installation of interior partitions, doors, lighting fixtures, mechanical and electrical equipment.
Applicant: Equinix, LLC
Record

Every row comes from a public permit, air-quality or planning record, linked to its source. A permit shows that work was proposed or approved. It does not show that space is available or that a building is finished. Capacity figures carry the basis the filing gives.

Cite this page

Data Center Scouts, "Equinix data center at 1990 N Stemmons Fwy Dallas, Dallas County, TX," https://datacenterscouts.com/data-center-projects/texas/1990-n-stemmons-fwy-dallas-dallas-county/, updated October 9, 2026. Source records are linked on the page. Journalists and researchers are welcome to use this data with a link back.

All Texas projects · Latest notable filings · Project tracker

Have a requirement measured in megawatts?

Send us the load, the markets and the date you need it energized. A senior advisor replies within one business day with the questions that matter and a plan for the search.

Our advisory is free to tenants. We are compensated by the provider you choose, and we disclose that on every shortlist. How we are paid