Every public record we hold for this address, newest first, with a link to the original document. Last change on record: November 20, 2019.

Project facts

Address5555 N CENTRAL EXPY, Dallas, TX 75205
JurisdictionDallas County, TX (City of Dallas)
Operator named in the recordsNot named. The filer is usually a contractor, engineer or single-purpose company.
Furthest step on recordWork finaled, November 25, 2019
Capacity stated in a filingNone stated
Floor area stated20,500 sq ft
Site area statedNone stated
Records on file6, from March 1, 2012 to November 20, 2019

Records on file

FiledType and statusWhat the record saysSource
Building permit
Complete
Electrical (EL) SMU DATA CENTER POWER UPGRADE ADD PANELING GEAR FOR SIDE ARecord
Building permit
Issued
Security System (SE) ACCESS CONTROL GATES AT THE SMU DATA CENTER.Record
Building permit
Complete
AREA 4 OF 4 Building (BU) GR, EL, ME, PL NEW CONSTRUCTION DATA CENTER AREA 4Record
Building permit
Complete
AREA 2 OF 4 Building (BU) GR, EL, PL, ME NEW CONSTRUCTION DATA CENTER AREA 2Record
Building permit
Complete
AREA 3 OF 4 Building (BU) GR, EL, PL, ME NEW CONSTRUCTION DATA CENTER AREA 3Record
Building permit
Complete
AREA 1 OF 4 Building (BU) GR, PL, EL, CS, FE, ME, FA, BF, PL, BF, FI, FI, BF, BF NEW CONSTRUCTION DATA CENTER AREA 1Record

Every row comes from a public permit, air-quality or planning record, linked to its source. A permit shows that work was proposed or approved. It does not show that space is available or that a building is finished. Capacity figures carry the basis the filing gives.

Cite this page

Data Center Scouts, "Data center project at 5555 N Central Expy, Dallas, TX," https://datacenterscouts.com/data-center-projects/texas/5555-n-central-expy-dallas/, updated October 9, 2026. Source records are linked on the page. Journalists and researchers are welcome to use this data with a link back.

All Texas projects · Latest notable filings · Project tracker

Have a requirement measured in megawatts?

Send us the load, the markets and the date you need it energized. A senior advisor replies within one business day with the questions that matter and a plan for the search.

Our advisory is free to tenants. We are compensated by the provider you choose, and we disclose that on every shortlist. How we are paid