Data center project at 6501 W William Cannon Dr Bldg H, Austin, TX

Every public record we hold for this address, newest first, with a link to the original document. Last change on record: August 18, 2017.

Project facts

Address6501 W WILLIAM CANNON DR BLDG H, AUSTIN, TX 78735
JurisdictionCity of Austin, TX (Travis County)
Operator named in the recordsNot named. The filer is usually a contractor, engineer or single-purpose company.
Furthest step on recordWork finaled, October 6, 2017
Capacity stated in a filingNone stated
Floor area statedNone stated
Site area statedNone stated
Records on file2, from November 8, 2006 to August 18, 2017

Records on file

FiledType and statusWhat the record saysSource
Building permit
Final
Scope of the work is to supply redundant power to the existing DATA Center. install a fly wheel fed from normal power and emergency power. Bypass panels will feed the High voltage panel in the data center which will feed 150 KVA transformer. Branch out to small NQD panels for branch circuits.Record
Building permit
VOID
Install (3) Nqod Panel Boards In H2 Data Center/ Feeders From Exst H1 1-Line Panel Boards To Nqod Panel Boards & Transitional Conduit Under Flr Cbl Tray Syst
Applicant: W K Jennings Electric Co., Inc
Record

Every row comes from a public permit, air-quality or planning record, linked to its source. A permit shows that work was proposed or approved. It does not show that space is available or that a building is finished. Capacity figures carry the basis the filing gives.

Cite this page

Data Center Scouts, "Data center project at 6501 W William Cannon Dr Bldg H, Austin, TX," https://datacenterscouts.com/data-center-projects/texas/6501-w-william-cannon-dr-bldg-h-austin/, updated October 9, 2026. Source records are linked on the page. Journalists and researchers are welcome to use this data with a link back.

All Texas projects · Latest notable filings · Project tracker

Have a requirement measured in megawatts?

Send us the load, the markets and the date you need it energized. A senior advisor replies within one business day with the questions that matter and a plan for the search.

Our advisory is free to tenants. We are compensated by the provider you choose, and we disclose that on every shortlist. How we are paid