Texas data center projects

Data center project at 7600 N Capital Of Texas Hwy Sb Bldg C Unit 300, Austin, TX

Every public record we hold for this address, newest first, with a link to the original document. Last change on record: August 17, 2015.

Project facts

Address7600 N CAPITAL OF TEXAS HWY SB BLDG C UNIT 300, AUSTIN, TX 78750
JurisdictionCity of Austin, TX (Travis County)
Operator named in the recordsNot named. The filer is usually a contractor, engineer or single-purpose company.
Furthest step on recordWork finaled, August 17, 2015
Capacity stated in a filingNone stated
Floor area statedNone stated
Site area statedNone stated
Records on file4, from February 20, 2009 to August 17, 2015

Records on file

FiledType and statusWhat the record saysSource
Building permit
Final
Relocating 25 (20 amp) 120 volt circuits in the data centerRecord
Building permit
Final
INSTALL 7 NEW L6-30 RECEPTACLES( 30A 208V SINGLE PHASE) AND 4 NEW 20A 120V DEDICATED QUADRAPLEX IN THE DATA CENTER FROM EXSITING 400 AMP PDU3Record
Building permit
Final
add receptacles in thedata center to feed relocated servers amd demo receptacles curently located unter the data center floor to existing bldg onlyRecord
Building permit
Final
Demo and relocate existing ciruit (PDU) in data center onlyRecord

Every row comes from a public permit, air-quality or planning record, linked to its source. A permit shows that work was proposed or approved. It does not show that space is available or that a building is finished. Capacity figures carry the basis the filing gives.

Cite this page

Data Center Scouts, "Data center project at 7600 N Capital Of Texas Hwy Sb Bldg C Unit 300, Austin, TX," https://datacenterscouts.com/data-center-projects/texas/7600-n-capital-of-texas-hwy-sb-bldg-c-unit-300-austin/, updated October 9, 2026. Source records are linked on the page. Journalists and researchers are welcome to use this data with a link back.

All Texas projects · Latest notable filings · Project tracker

Have a requirement measured in megawatts?

Send us the load, the markets and the date you need it energized. A senior advisor replies within one business day with the questions that matter and a plan for the search.

Our advisory is free to tenants. We are compensated by the provider you choose, and we disclose that on every shortlist. How we are paid