Project facts

Address22175 BEAUMEADE CIR, ASHBURN, VA
JurisdictionLoudoun County, VA
Operator named in the recordsEquinix
Furthest step on recordBuilding permit issued, July 8, 2026
Capacity stated in a filingNone stated
Floor area statedNone stated
Site area statedNone stated
Records on file4, from June 26, 2025 to November 5, 2025

Records on file

FiledType and statusWhat the record saysSource
Building permit
Issued
The Equinix DC21-P3 project involves the installation of a new equipment yard on the west side of the building which includes two additional generators, transformers, and premanufactured low-voltage electrical skids. Additionally, four air-cooled chillers will be installed at the roof level. Further mechanical and electrical equipment will also be installed within the existing data hall space.Record
Building permit
Issued
The Equinix DC21-P3 project involves the installation of a new equipment yard on the west side of the building which includes two additional generators, transformers, and premanufactured low-voltage electrical skids. Additionally, four air-cooled chillers will be installed at the roof level. Further mechanical and electrical equipment will also be installed within the existing data hall space.Record
Building permit
Issued
The Equinix DC21-P2 project involves the installation of a generator, a transformer, and a premanufactured low-voltage electrical skid in the existing equipment yard. Additionally, two air-cooled chillers will be installed at the roof level, and the chilled water loop will be extended accordingly. Further mechanical and electrical equipment will also be installed within the existing data hall space.Record
Building permit
Issued
The Equinix DC21-P2 project involves the installation of a generator, a transformer, and a premanufactured low-voltage electrical skid in the existing equipment yard. Additionally, two air-cooled chillers will be installed at the roof level, and the chilled water loop will be extended accordingly. Further mechanical and electrical equipment will also be installed within the existing data hall space.Record

Every row comes from a public permit, air-quality or planning record, linked to its source. A permit shows that work was proposed or approved. It does not show that space is available or that a building is finished. Capacity figures carry the basis the filing gives.

Cite this page

Data Center Scouts, "Equinix data center at 22175 Beaumeade Cir, Ashburn, VA," https://datacenterscouts.com/data-center-projects/virginia/22175-beaumeade-cir-ashburn/, updated October 9, 2026. Source records are linked on the page. Journalists and researchers are welcome to use this data with a link back.

All Virginia projects · Latest notable filings · Project tracker

Have a requirement measured in megawatts?