Project facts
| Address | 22190 LOUDOUN COUNTY PKWY, ASHBURN, VA |
|---|---|
| Jurisdiction | Loudoun County, VA |
| Operator named in the records | Not named. The filer is usually a contractor, engineer or single-purpose company. |
| Furthest step on record | Building permit issued, September 17, 2026 |
| Capacity stated in a filing | 96 MW (Capacity stated in the filing) |
| Floor area stated | 1,030,408 sq ft |
| Site area stated | None stated |
| Records on file | 12, from June 18, 2025 to June 29, 2026 |
Capacity wording in the filing: "New build 2-story 96MW data center on existing campus for CloudHQ. Will include ma"
Records on file
| Filed | Type and status | What the record says | Source |
|---|---|---|---|
| Building permit Invoiced and Paid - Same Day | DULLES BERRY LC8 DATA CENTER RETAINING WALL STANDALONE MISC. STRUCTURE PERMIT; CONTRACTOR IS: HOLDER CONSTRUCTION GROUP INC. | Record | |
| Building permit Issued | DULLES BERRY LC8 DATA CENTER RETAINING WALL STANDALONE MISC. STRUCTURE PERMIT; CONTRACTOR IS: HOLDER CONSTRUCTION GROUP INC. | Record | |
| Building permit Issued | Phase 2 Tenant Interiors Buildout of the LC8 Data Center Building. Phase 2 includes mechanical, electrical rooms and equipment on levels 1-3 to support turnover of data halls 102 and 202. | Record | |
| Building permit Issued | Phase 4 Tenant Interiors Buildout of the LC8 Data Center Building. Phase 4 includes tenant office space and storage rooms. | Record | |
| Building permit Issued | Phase 1 Tenant Interiors Buildout of the LC8 Data Center Building. Phase 1 includes Corridors, Restrooms, Reserve Electric/Mechanical Rooms, Level 2 office space, Loading dock, and the passenger elevator. | Record | |
| Building permit Issued | Phase 3 Tenant Interiors Buildout of the LC8 Data Center Building. Phase 3 includes mechanical, electrical rooms and equipment on levels 1-3 to support turnover of data halls 101 and 201. | Record | |
| Building permit Issued | Phase 2 Tenant Interiors Buildout of the LC8 Data Center Building. Phase 2 includes mechanical, electrical rooms and equipment on levels 1-3 to support turnover of data halls 102 and 202. | Record | |
| Building permit Issued | Phase 4 Tenant Interiors Buildout of the LC8 Data Center Building. Phase 4 includes tenant office space and storage rooms. | Record | |
| Building permit Issued | Phase 3 Tenant Interiors Buildout of the LC8 Data Center Building. Phase 3 includes mechanical, electrical rooms and equipment on levels 1-3 to support turnover of data halls 101 and 201. | Record | |
| Building permit Issued | Phase 1 Tenant Interiors Buildout of the LC8 Data Center Building. Phase 1 includes Corridors, Restrooms, Reserve Electric/Mechanical Rooms, Level 2 office space, Loading dock, and the passenger elevator. | Record | |
| Building permit Issued | New build 2-story 96MW data center on existing campus for CloudHQ. Will include mainly data hall spaces with both cloud and tenant admin spaces. Includes rooftop platform for air-cooled chillers and generator penthouse spaces. | Record | |
| Building permit Issued | FULL APPROVAL New build 2-story 96MW data center on existing campus for CloudHQ. Will include mainly data hall spaces with both cloud and tenant admin spaces. Includes rooftop platform for air-cooled chillers and generator penthouse spaces. | Record |
Every row comes from a public permit, air-quality or planning record, linked to its source. A permit shows that work was proposed or approved. It does not show that space is available or that a building is finished. Capacity figures carry the basis the filing gives.
Cite this page
Data Center Scouts, "Data center project at 22190 Loudoun County Pkwy, Ashburn, VA," https://datacenterscouts.com/data-center-projects/virginia/22190-loudoun-county-pkwy-ashburn/, updated October 9, 2026. Source records are linked on the page. Journalists and researchers are welcome to use this data with a link back.
All Virginia projects · Latest notable filings · Project tracker