Data center project at 22190 Loudoun County Pkwy, Ashburn, VA

Every public record we hold for this address, newest first, with a link to the original document. Last change on record: June 29, 2026.

Project facts

Address22190 LOUDOUN COUNTY PKWY, ASHBURN, VA
JurisdictionLoudoun County, VA
Operator named in the recordsNot named. The filer is usually a contractor, engineer or single-purpose company.
Furthest step on recordBuilding permit issued, September 17, 2026
Capacity stated in a filing96 MW (Capacity stated in the filing)
Floor area stated1,030,408 sq ft
Site area statedNone stated
Records on file12, from June 18, 2025 to June 29, 2026

Capacity wording in the filing: "New build 2-story 96MW data center on existing campus for CloudHQ. Will include ma"

Records on file

FiledType and statusWhat the record saysSource
Building permit
Invoiced and Paid - Same Day
DULLES BERRY LC8 DATA CENTER RETAINING WALL STANDALONE MISC. STRUCTURE PERMIT; CONTRACTOR IS: HOLDER CONSTRUCTION GROUP INC.Record
Building permit
Issued
DULLES BERRY LC8 DATA CENTER RETAINING WALL STANDALONE MISC. STRUCTURE PERMIT; CONTRACTOR IS: HOLDER CONSTRUCTION GROUP INC.Record
Building permit
Issued
Phase 2 Tenant Interiors Buildout of the LC8 Data Center Building. Phase 2 includes mechanical, electrical rooms and equipment on levels 1-3 to support turnover of data halls 102 and 202.Record
Building permit
Issued
Phase 4 Tenant Interiors Buildout of the LC8 Data Center Building. Phase 4 includes tenant office space and storage rooms.Record
Building permit
Issued
Phase 1 Tenant Interiors Buildout of the LC8 Data Center Building. Phase 1 includes Corridors, Restrooms, Reserve Electric/Mechanical Rooms, Level 2 office space, Loading dock, and the passenger elevator.Record
Building permit
Issued
Phase 3 Tenant Interiors Buildout of the LC8 Data Center Building. Phase 3 includes mechanical, electrical rooms and equipment on levels 1-3 to support turnover of data halls 101 and 201.Record
Building permit
Issued
Phase 2 Tenant Interiors Buildout of the LC8 Data Center Building. Phase 2 includes mechanical, electrical rooms and equipment on levels 1-3 to support turnover of data halls 102 and 202.Record
Building permit
Issued
Phase 4 Tenant Interiors Buildout of the LC8 Data Center Building. Phase 4 includes tenant office space and storage rooms.Record
Building permit
Issued
Phase 3 Tenant Interiors Buildout of the LC8 Data Center Building. Phase 3 includes mechanical, electrical rooms and equipment on levels 1-3 to support turnover of data halls 101 and 201.Record
Building permit
Issued
Phase 1 Tenant Interiors Buildout of the LC8 Data Center Building. Phase 1 includes Corridors, Restrooms, Reserve Electric/Mechanical Rooms, Level 2 office space, Loading dock, and the passenger elevator.Record
Building permit
Issued
New build 2-story 96MW data center on existing campus for CloudHQ. Will include mainly data hall spaces with both cloud and tenant admin spaces. Includes rooftop platform for air-cooled chillers and generator penthouse spaces.Record
Building permit
Issued
FULL APPROVAL New build 2-story 96MW data center on existing campus for CloudHQ. Will include mainly data hall spaces with both cloud and tenant admin spaces. Includes rooftop platform for air-cooled chillers and generator penthouse spaces.Record

Every row comes from a public permit, air-quality or planning record, linked to its source. A permit shows that work was proposed or approved. It does not show that space is available or that a building is finished. Capacity figures carry the basis the filing gives.

Cite this page

Data Center Scouts, "Data center project at 22190 Loudoun County Pkwy, Ashburn, VA," https://datacenterscouts.com/data-center-projects/virginia/22190-loudoun-county-pkwy-ashburn/, updated October 9, 2026. Source records are linked on the page. Journalists and researchers are welcome to use this data with a link back.

All Virginia projects · Latest notable filings · Project tracker

Have a requirement measured in megawatts?

Send us the load, the markets and the date you need it energized. A senior advisor replies within one business day with the questions that matter and a plan for the search.

Our advisory is free to tenants. We are compensated by the provider you choose, and we disclose that on every shortlist. How we are paid