Project facts
| Address | 22760 PACIFIC BLVD, STERLING, VA |
|---|---|
| Jurisdiction | Loudoun County, VA |
| Operator named in the records | Not named. The filer is usually a contractor, engineer or single-purpose company. |
| Furthest step on record | Building permit issued, December 12, 2025 |
| Capacity stated in a filing | None stated |
| Floor area stated | None stated |
| Site area stated | None stated |
| Records on file | 12, from October 16, 2025 to October 23, 2025 |
Records on file
| Filed | Type and status | What the record says | Source |
|---|---|---|---|
| Building permit Issued | This project was originally permitted (parent permit B20590530100) for the full fit-up of the building but due to power availability only four of the ten data halls were constructed. We are submitting for Tenant Fit -Up for the remaining six data halls. This submittal is for Phase 5 (ROMP 5). As discussed with the Building Official and County staff, these remaining phases will be applied under VA USBC-2018 codes as the standard since the base building was permitted under that code. Architecturally the interior work typically consists of adding demising walls (metal stud and drywall) between the data halls and associated man and access doors. Exterior architectural work is screening for equipment and setting equipment on the roof. Trade permits will be collected separately. | Record | |
| Building permit Issued | This project was originally permitted (parent permit B20590530100) for the full fit-up of the building but due to power availability only four of the ten data halls were constructed. We are submitting for Tenant Fit -Up for the remaining six data halls. This submittal is for Phase 8 (ROMP 8). As discussed with the Building Official and County staff, these remaining phases will be applied under VA USBC-2018 codes as the standard since the base building was permitted under that code. Architecturally the interior work typically consists of adding demising walls (metal stud and drywall) between the data halls and associated man and access doors. Exterior architectural work is screening for equipment and setting equipment on the roof. Trade permits will be collected separately. | Record | |
| Building permit Issued | This project was originally permitted (parent permit B20590530100) for the full fit-up of the building but due to power availability only four of the ten data halls were constructed. We are submitting for Tenant Fit -Up for the remaining six data halls. This submittal is for Phase 10 (ROMP 10). As discussed with the Building Official and County staff, these remaining phases will be applied under VA USBC-2018 codes as the standard since the base building was permitted under that code. Architecturally the interior work typically consists of adding demising walls (metal stud and drywall) between the data halls and associated man and access doors. Exterior architectural work is screening for equipment and setting equipment on the roof. Trade permits will be collected separately. | Record | |
| Building permit Issued | This project was originally permitted (parent permit B20590530100) for the full fit-up of the building but due to power availability only four of the ten data halls were constructed. We are submitting for Tenant Fit -Up for the remaining six data halls. This submittal is for Phase 4 (ROMP 4). As discussed with the Building Official and County staff, these remaining phases will be applied under VA USBC-2018 codes as the standard since the base building was permitted under that code. Architecturally the interior work typically consists of adding demising walls (metal stud and drywall) between the data halls and associated man and access doors. Exterior architectural work is screening for equipment and setting equipment on the roof. Trade permits will be collected separately. | Record | |
| Building permit Issued | This project was originally permitted (parent permit B20590530100) for the full fit-up of the building but due to power availability only four of the ten data halls were constructed. We are submitting for Tenant Fit -Up for the remaining six data halls. This submittal is for Phase 3 (ROMP 3). As discussed with the Building Official and County staff, these remaining phases will be applied for under VA USBC-2018 codes as the standard since the base building was permitted under that code. Architecturally the interior work typically consists of adding demising walls (metal stud and drywall) between the data halls and associated man and access doors. Exterior architectural work is screening for equipment and setting equipment on the roof. Trade permits will be collected separately. | Record | |
| Building permit Issued | This project was originally permitted (parent permit B20590530100) for the full fit-up of the building but due to power availability only four of the ten data halls were constructed. We are submitting for Tenant Fit -Up for the remaining six data halls. This submittal is for Phase 9 (ROMP 9). As discussed with the Building Official and County staff, these remaining phases will be applied under VA USBC-2018 codes as the standard since the base building was permitted under that code. Architecturally the interior work typically consists of adding demising walls (metal stud and drywall) between the data halls and associated man and access doors. Exterior architectural work is screening for equipment and setting equipment on the roof. Trade permits will be collected separately. | Record | |
| Building permit Issued | This project was originally permitted (parent permit B20590530100) for the full fit-up of the building but due to power availability only four of the ten data halls were constructed. We are submitting for Tenant Fit -Up for the remaining six data halls. This submittal is for Phase 8 (ROMP 8). As discussed with the Building Official and County staff, these remaining phases will be applied under VA USBC-2018 codes as the standard since the base building was permitted under that code. Architecturally the interior work typically consists of adding demising walls (metal stud and drywall) between the data halls and associated man and access doors. Exterior architectural work is screening for equipment and setting equipment on the roof. Trade permits will be collected separately. | Record | |
| Building permit Issued | This project was originally permitted (parent permit B20590530100) for the full fit-up of the building but due to power availability only four of the ten data halls were constructed. We are submitting for Tenant Fit -Up for the remaining six data halls. This submittal is for Phase 10 (ROMP 10). As discussed with the Building Official and County staff, these remaining phases will be applied under VA USBC-2018 codes as the standard since the base building was permitted under that code. Architecturally the interior work typically consists of adding demising walls (metal stud and drywall) between the data halls and associated man and access doors. Exterior architectural work is screening for equipment and setting equipment on the roof. Trade permits will be collected separately. | Record | |
| Building permit Issued | This project was originally permitted (parent permit B20590530100) for the full fit-up of the building but due to power availability only four of the ten data halls were constructed. We are submitting for Tenant Fit -Up for the remaining six data halls. This submittal is for Phase 5 (ROMP 5). As discussed with the Building Official and County staff, these remaining phases will be applied under VA USBC-2018 codes as the standard since the base building was permitted under that code. Architecturally the interior work typically consists of adding demising walls (metal stud and drywall) between the data halls and associated man and access doors. Exterior architectural work is screening for equipment and setting equipment on the roof. Trade permits will be collected separately. | Record | |
| Building permit Issued | This project was originally permitted (parent permit B20590530100) for the full fit-up of the building but due to power availability only four of the ten data halls were constructed. We are submitting for Tenant Fit -Up for the remaining six data halls. This submittal is for Phase 9 (ROMP 9). As discussed with the Building Official and County staff, these remaining phases will be applied under VA USBC-2018 codes as the standard since the base building was permitted under that code. Architecturally the interior work typically consists of adding demising walls (metal stud and drywall) between the data halls and associated man and access doors. Exterior architectural work is screening for equipment and setting equipment on the roof. Trade permits will be collected separately. | Record | |
| Building permit Issued | This project was originally permitted (parent permit B20590530100) for the full fit-up of the building but due to power availability only four of the ten data halls were constructed. We are submitting for Tenant Fit -Up for the remaining six data halls. This submittal is for Phase 4 (ROMP 4). As discussed with the Building Official and County staff, these remaining phases will be applied under VA USBC-2018 codes as the standard since the base building was permitted under that code. Architecturally the interior work typically consists of adding demising walls (metal stud and drywall) between the data halls and associated man and access doors. Exterior architectural work is screening for equipment and setting equipment on the roof. Trade permits will be collected separately. | Record | |
| Building permit Issued | This project was originally permitted (parent permit B20590530100) for the full fit-up of the building but due to power availability only four of the ten data halls were constructed. We are submitting for Tenant Fit -Up for the remaining six data halls. This submittal is for Phase 3 (ROMP 3). As discussed with the Building Official and County staff, these remaining phases will be applied for under VA USBC-2018 codes as the standard since the base building was permitted under that code. Architecturally the interior work typically consists of adding demising walls (metal stud and drywall) between the data halls and associated man and access doors. Exterior architectural work is screening for equipment and setting equipment on the roof. Trade permits will be collected separately. | Record |
Every row comes from a public permit, air-quality or planning record, linked to its source. A permit shows that work was proposed or approved. It does not show that space is available or that a building is finished. Capacity figures carry the basis the filing gives.
Cite this page
Data Center Scouts, "Data center project at 22760 Pacific Blvd, Sterling, VA," https://datacenterscouts.com/data-center-projects/virginia/22760-pacific-blvd-sterling/, updated October 9, 2026. Source records are linked on the page. Journalists and researchers are welcome to use this data with a link back.