Data center project at 44740 Performance Cir, Ashburn, VA

Every public record we hold for this address, newest first, with a link to the original document. Last change on record: April 22, 2025.

Project facts

Address44740 PERFORMANCE CIR, ASHBURN, VA
JurisdictionLoudoun County, VA
Operator named in the recordsNot named. The filer is usually a contractor, engineer or single-purpose company.
Furthest step on recordBuilding permit issued, May 1, 2025
Capacity stated in a filingNone stated
Floor area statedNone stated
Site area statedNone stated
Records on file1, from April 22, 2025 to April 22, 2025

Records on file

FiledType and statusWhat the record saysSource
Building permit
Issued
The scope of the work of the project encompasses buildout of a data cage for liquid cooling supported equipment. Involves electrical work to support future owner tools, including network racks and cage partitions, within the north data hall on the fourth floor of an existing four-story building. No modifications will be made to the space or the building’s structure. The scope of work detailed in these documents includes all architectural, structural, mechanical, and electrical components required for the construction of the liquid cooled build-out of the data cage.Record

Every row comes from a public permit, air-quality or planning record, linked to its source. A permit shows that work was proposed or approved. It does not show that space is available or that a building is finished. Capacity figures carry the basis the filing gives.

Cite this page

Data Center Scouts, "Data center project at 44740 Performance Cir, Ashburn, VA," https://datacenterscouts.com/data-center-projects/virginia/44740-performance-cir-ashburn/, updated October 9, 2026. Source records are linked on the page. Journalists and researchers are welcome to use this data with a link back.

All Virginia projects · Latest notable filings · Project tracker

Have a requirement measured in megawatts?

Send us the load, the markets and the date you need it energized. A senior advisor replies within one business day with the questions that matter and a plan for the search.

Our advisory is free to tenants. We are compensated by the provider you choose, and we disclose that on every shortlist. How we are paid