Virginia data center projects

EdgeCore data center at 45831 Maries Rd, Sterling, VA

Every public record we hold for this address, newest first, with a link to the original document. Last change on record: March 26, 2026.

Project facts

Address45831 MARIES RD, STERLING, VA
JurisdictionLoudoun County, VA
Operator named in the recordsEdgeCore
Furthest step on recordBuilding permit issued, May 27, 2026
Capacity stated in a filing36 MW (Capacity stated in the filing)
Floor area stated416,100 sq ft
Site area statedNone stated
Records on file8, from December 13, 2024 to March 26, 2026

Capacity wording in the filing: "...TENANT IMPROVEMENTS INCLUDE THE INTERIOR FIT OUT OF THREE EXISTING 36MW DATA HALLS AND OFFICE SPACES WITH AN APPROXIMATE TOTAL AREA"

Records on file

FiledType and statusWhat the record saysSource
Building permit
Issued
Data Hall build out for two 12 MW's, which contains busway and hot aisle containment. Phase 3Record
Building permit
Issued
Data Hall build out for two 12 MW's, which contains busway and hot aisle containment. Phase 2. Electronic CopyRecord
Building permit
Issued
TENANT FIT OUT (TFO) OF EXISTING ROOMS WITHIN THE EDGECORE AS01 DATA CENTER BUILDING. THE TENANT IMPROVEMENTS INCLUDE THE INTERIOR FIT OUT OF THREE EXISTING 36MW DATA HALLS AND OFFICE SPACES WITH AN APPROXIMATE TOTAL AREA OF 107,583 SQUARE FEET.Record
Building permit
Issued
TENANT FIT OUT (TFO) OF EXISTING ROOMS WITHIN THE EDGECORE AS01 DATA CENTER BUILDING. THE TENANT IMPROVEMENTS INCLUDE THE INTERIOR FIT OUT OF THREE EXISTING 36MW DATA HALLS AND OFFICE SPACES WITH AN APPROXIMATE TOTAL AREA OF 107,583 SQUARE FEET.Record
Building permit
Issued
Data Hall and Electrical Room Build. Also includes a 2nd floor and 1st floor data center build-out, which consists of 24 MWs. (Phase 3)Record
Building permit
Issued
Data Hall and Electrical Room Build. Also includes a 2nd floor and 1st floor data center build-out, which consists of 24 MWs. (Phase 3)Record
Building permit
Issued
Core and Shell building with an admin area. Also includes a 3rd floor data center build out which consist of 24 MWs.Record
Building permit
Issued
Core and Shell building with an admin area. Also includes a 3rd floor data center build out which consist of 24 MWs. Electronic copyRecord

Every row comes from a public permit, air-quality or planning record, linked to its source. A permit shows that work was proposed or approved. It does not show that space is available or that a building is finished. Capacity figures carry the basis the filing gives.

Cite this page

Data Center Scouts, "EdgeCore data center at 45831 Maries Rd, Sterling, VA," https://datacenterscouts.com/data-center-projects/virginia/45831-maries-rd-sterling/, updated October 9, 2026. Source records are linked on the page. Journalists and researchers are welcome to use this data with a link back.

All Virginia projects · Latest notable filings · Project tracker

Have a requirement measured in megawatts?

Send us the load, the markets and the date you need it energized. A senior advisor replies within one business day with the questions that matter and a plan for the search.

Our advisory is free to tenants. We are compensated by the provider you choose, and we disclose that on every shortlist. How we are paid