EdgeConneX data center at 3011 S 52nd St, Tempe, AZ

Every public record we hold for this address, newest first, with a link to the original document. Last change on record: June 11, 2024.

Project facts

Address3011 S 52nd St, Tempe, AZ 85282
JurisdictionMaricopa County, AZ (MCAQD air permits)
Operator named in the recordsEdgeConneX
Furthest step on recordAir permit on file, June 11, 2024
Capacity stated in a filingNone stated
Floor area statedNone stated
Site area statedNone stated
Records on file4, from March 2, 2020 to June 11, 2024

Records on file

FiledType and statusWhat the record saysSource
Air permit
Application received (NTV Application); viewer state Submitted
3011 South 52nd Street: NTV Application A0009525 received 2024-06-11
Applicant: 3011 South 52nd Street LLC
Record
Issued Air permit
Permit signed
3011 South 52nd Street: permit signed 2022-07-14 (SIGNED FINAL PERMIT)
Applicant: 3011 South 52nd Street LLC
Record
Issued Air permit
Permit signed
3011 South 52nd Street: permit signed 2020-04-06 (SIGNED FINAL PERMIT)
Applicant: 3011 South 52nd Street LLC
Record
Air permit
Permit application received
3011 South 52nd Street: permit application received 2020-03-02 (APP WITH SPECS)
Applicant: 3011 South 52nd Street LLC
Record

Every row comes from a public permit, air-quality or planning record, linked to its source. A permit shows that work was proposed or approved. It does not show that space is available or that a building is finished. Capacity figures carry the basis the filing gives.

Cite this page

Data Center Scouts, "EdgeConneX data center at 3011 S 52nd St, Tempe, AZ," https://datacenterscouts.com/data-center-projects/arizona/3011-s-52nd-st-tempe/, updated October 9, 2026. Source records are linked on the page. Journalists and researchers are welcome to use this data with a link back.

All Arizona projects · Latest notable filings · Project tracker

Have a requirement measured in megawatts?

Send us the load, the markets and the date you need it energized. A senior advisor replies within one business day with the questions that matter and a plan for the search.

Our advisory is free to tenants. We are compensated by the provider you choose, and we disclose that on every shortlist. How we are paid