Project facts
| Address | 3841 S Ellsworth Rd, Mesa, AZ 85212 |
|---|---|
| Jurisdiction | Maricopa County, AZ (MCAQD air permits) |
| Operator named in the records | Not named. The filer is usually a contractor, engineer or single-purpose company. |
| Furthest step on record | Air permit on file, August 19, 2026 |
| Capacity stated in a filing | None stated |
| Floor area stated | 29,535 sq ft |
| Site area stated | None stated |
| Records on file | 9, from June 24, 2021 to August 19, 2026 |
Records on file
| Filed | Type and status | What the record says | Source |
|---|---|---|---|
| Air permit Application received (NTV Application); viewer state Submitted | Redale LLC: NTV Application A0014750 received 2026-08-19 | Record | |
| Building permit In Review | Installation of four (4) Meet Me Hut (MMH) structures within the existing data center campus. The MMHs are small, non-occupied utility structures that provide above-ground fiber optic interconnection points between telecommunications carriers and the campus network. Applicant: Brian Andersen | Record | |
| Building permit In Review | New modular building for data center IT conduit, permitted by AZDOH. Group U occupancy. New foundation (29,535 SF) and canopy (144 SF). New electrical grounding systems for modular building under this permit. Special Inspections required: Soils, steel construction, concrete construction, high strength bolts, and post-installed anchors. Approved as noted. Results in CofC. Applicant: Kevin Gehrke | Record | |
| Building permit Building permit applied for | Additional Data Center Building | Record | |
| Air permit Application received (NTV Application); viewer state Submitted | Redale: NTV Application A0011557 received 2025-02-03 Applicant: Redale LLC | Record | |
| Issued | Air permit Permit signed | Redale LLC: permit signed 2023-08-18 (SIGNED FINAL PERMIT) | Record |
| Air permit Modification application received | Redale LLC: modification application received 2023-01-25 (MOD) | Record | |
| Issued | Air permit Permit signed | Redale LLC: permit signed 2022-02-25 (SIGNED FINAL PERMIT) | Record |
| Air permit Permit application received | Redale LLC: permit application received 2021-06-24 (APP) | Record |
Every row comes from a public permit, air-quality or planning record, linked to its source. A permit shows that work was proposed or approved. It does not show that space is available or that a building is finished. Capacity figures carry the basis the filing gives.