Wholesale data center advisory for tenants and landowners, from 1 MW to campus scale

Arizona data center projects

Data center project at 3841 S Ellsworth Rd, Mesa, AZ

Every public record we hold for this address, newest first, with a link to the original document. Last change on record: August 19, 2026.

Project facts

Address3841 S Ellsworth Rd, Mesa, AZ 85212
JurisdictionMaricopa County, AZ (MCAQD air permits)
Operator named in the recordsNot named. The filer is usually a contractor, engineer or single-purpose company.
Furthest step on recordAir permit on file, August 19, 2026
Capacity stated in a filingNone stated
Floor area stated29,535 sq ft
Site area statedNone stated
Records on file9, from June 24, 2021 to August 19, 2026

Records on file

FiledType and statusWhat the record saysSource
Air permit
Application received (NTV Application); viewer state Submitted
Redale LLC: NTV Application A0014750 received 2026-08-19Record
Building permit
In Review
Installation of four (4) Meet Me Hut (MMH) structures within the existing data center campus. The MMHs are small, non-occupied utility structures that provide above-ground fiber optic interconnection points between telecommunications carriers and the campus network.
Applicant: Brian Andersen
Record
Building permit
In Review
New modular building for data center IT conduit, permitted by AZDOH. Group U occupancy. New foundation (29,535 SF) and canopy (144 SF). New electrical grounding systems for modular building under this permit. Special Inspections required: Soils, steel construction, concrete construction, high strength bolts, and post-installed anchors. Approved as noted. Results in CofC.
Applicant: Kevin Gehrke
Record
Building permit
Building permit applied for
Additional Data Center BuildingRecord
Air permit
Application received (NTV Application); viewer state Submitted
Redale: NTV Application A0011557 received 2025-02-03
Applicant: Redale LLC
Record
Issued Air permit
Permit signed
Redale LLC: permit signed 2023-08-18 (SIGNED FINAL PERMIT)Record
Air permit
Modification application received
Redale LLC: modification application received 2023-01-25 (MOD)Record
Issued Air permit
Permit signed
Redale LLC: permit signed 2022-02-25 (SIGNED FINAL PERMIT)Record
Air permit
Permit application received
Redale LLC: permit application received 2021-06-24 (APP)Record

Every row comes from a public permit, air-quality or planning record, linked to its source. A permit shows that work was proposed or approved. It does not show that space is available or that a building is finished. Capacity figures carry the basis the filing gives.

Cite this page

Data Center Scouts, "Data center project at 3841 S Ellsworth Rd, Mesa, AZ," https://datacenterscouts.com/data-center-projects/arizona/3841-s-ellsworth-rd-mesa/, updated October 9, 2026. Source records are linked on the page. Journalists and researchers are welcome to use this data with a link back.

All Arizona projects · Latest notable filings · Project tracker

Have a requirement measured in megawatts?