Project facts
| Address | 7232 E Elliot Rd, Mesa, AZ 85212 |
|---|---|
| Jurisdiction | Maricopa County, AZ (Mesa / Goodyear) |
| Operator named in the records | Not named. The filer is usually a contractor, engineer or single-purpose company. |
| Furthest step on record | Building permit issued, September 2, 2026 |
| Capacity stated in a filing | None stated |
| Floor area stated | 285,282 sq ft |
| Site area stated | None stated |
| Records on file | 11, from August 9, 2023 to July 31, 2026 |
Records on file
| Filed | Type and status | What the record says | Source |
|---|---|---|---|
| Building permit Submitted | PROVIDE AND INSTALL A NEW NFW-50X ADDRESSABLE FIRE ALARM SYSTEM FOR THE PROTECTION AT THE MESA MSA 2A DATA CENTER - BREAK TENT. Applicant: Climatec | Record | |
| Building permit In Review | Proposed improvements to the existing site entrance at the MSA Data Center, including driveway widening, proposed guard shack and trucker booth Pre-Engineered Metal Buildings (PEMBs), and additional parking expansion. Applicant: Connor Sperry | Record | |
| Building permit Issued | New ground up 285,282 SF unlimited area data hall building with type II-B construction. Group B occupancy classification. Project includes the installation of mechanical and electrical yards. Foundation under PMT25-22348. Reference: PMT26-07321 for restroom code modifications, PMT26-07319 for fire access code modification and PMT26-07315 for fire sprinklers. Deferred fire sprinklers, fire alarm with emergency voice/alarm AND VESDA systems, cold form steel, pipe support systems, prefabricated buildings, and fuel filling stations. Special inspections for steel, concrete, masonry, high strength bolting, soils, cast-in-place deep foundations, rammed aggregate piers, fire-resistant penetrations and joints, spray-applied fire-resistant materials, ERRC, and electrical. Results in CofO. Applicant: JE Dunn | Record | |
| Building permit Issued | Foundations: This scope includes the construction of a 284,497 SF Data Center Building and supporting equipment and ancillary building foundations in the mechanical and electrical yards. This covers foundations only and nothing above ground or ‘vertical’ in nature. Approved as noted. Civil sheets, water meters and impact fees will be charged on main permit. Utilities: This scope includes all underground utilities as well as any sub-slab infrastructure (stub ups) necessary to construct foundations. Please note, all underground utility connections to existing infrastructure are within the parcel (‘private’), meaning there are NO new connections off-site, or public connections. Applicant: JE Dunn | Record | |
| Air permit Application received (NTV Application); viewer state Submitted | Stone Applications: NTV Application A0013023 received 2025-10-24 Applicant: Stone Applications LLC | Record | |
| Building permit Building permit applied for | Additional Data Center (Phase 3) | Record | |
| Building permit Issued | The RedHawk HUB is a one-story, office support building serving the RedHawk Data Center campus located at the intersection of Sossaman and Elliot Road, located within the Red Hawk Opportunity District (RHEOD). This permit is for 11,638 SF, Group B occupancy, Type V-B construction office building. New work consists mostly of open office spaces, meeting rooms, and some small amenity spaces such as a Micro Kitchen and Outdoor patio space. Deferred fire sprinklers and fire alarms. No new water meter. No new Electrical meter. results in CoO. Applicant: Nicholas Cross | Record | |
| Building permit Issued | Foundation and underground/slab utilities only for new Data Center. Special inspections required for steel, fabricators, concrete, soils, driven deep foundations. Aerial apparatus access code modification: PMT24-12147. Applicant: JE Dunn | Record | |
| Air permit Application received (NTV Application); viewer state Submitted | Stone Applications: NTV Application A0007453 received 2023-09-22 Applicant: Stone Applications LLC | Record | |
| Building permit C of O Issued | New ground up data center with electrical yard, mechanical yard, six pump houses and a pump house pharmacy, two electrical buildings with associated platform/decks, trestle conveying MEP, chillers. Site entrance guard booth. Perimeter walls. The pumphouse and pumphouse with pharmacy will be PEMBs. Occupancy classifications, B, S-2, F-1, construction type II-B, unlimited area. Special inspections for fire caulking, emergency response radio coverage, steel, fabricators, concrete, masonry, soils, driven deep foundation, post installed anchors, cold form metal framing, and architectural precast wall panels. Deferred submittals: fire sprinklers, fire alarms, structural steel connections: cold form studs & Unistrut framing: pipes slides, guides & anchors: steel stairs & stair landing: specialty equipment skids & anchorage: makeup water tank and foundation. Install Emergency Responder Radio System. Code MOD: PMT23-18216. Three new 3-phase electric meters. HOLD CofO for completion and accepta Applicant: JE Dunn | Record | |
| Not stated | Building permit PENDING | Redhawk - Phase 2 | Record |
Every row comes from a public permit, air-quality or planning record, linked to its source. A permit shows that work was proposed or approved. It does not show that space is available or that a building is finished. Capacity figures carry the basis the filing gives.