Massachusetts data center projects

Data center project at 21-53 Summer St, Boston, MA

Every public record we hold for this address, newest first, with a link to the original document. Last change on record: date not stated.

Project facts

Address21-53 Summer ST, Boston, MA 02110
JurisdictionCity of Boston, MA (Suffolk County)
Operator named in the recordsNot named. The filer is usually a contractor, engineer or single-purpose company.
Furthest step on recordBuilding permit issued, December 17, 2025
Capacity stated in a filingNone stated
Floor area statedNone stated
Site area statedNone stated
Records on file3, from date not stated to date not stated

Records on file

FiledType and statusWhat the record saysSource
Issued Building permit
Open
Install new aspirated fire alarm system on 6th floor ,connected to existing fire alarm system for data center.
Applicant: Douglas Lanceleve
Record
Issued Building permit
Open
Installation of a 7200 & 11700 Gallon fuel oil tanks. This job is mechanical/electrical and will require firestopping inspection. These tanks are to be installed in an existing room containing other fuel oil tanks for standby generation of data center.
Applicant: willard Cleveland
Record
Issued Building permit
Open
Install new PDU units with panels, new overhead outlets for data center
Applicant: Douglas Lanceleve
Record

Every row comes from a public permit, air-quality or planning record, linked to its source. A permit shows that work was proposed or approved. It does not show that space is available or that a building is finished. Capacity figures carry the basis the filing gives.

Cite this page

Data Center Scouts, "Data center project at 21-53 Summer St, Boston, MA," https://datacenterscouts.com/data-center-projects/massachusetts/21-53-summer-st-boston/, updated October 9, 2026. Source records are linked on the page. Journalists and researchers are welcome to use this data with a link back.

All Massachusetts projects · Latest notable filings · Project tracker

Have a requirement measured in megawatts?

Send us the load, the markets and the date you need it energized. A senior advisor replies within one business day with the questions that matter and a plan for the search.

Our advisory is free to tenants. We are compensated by the provider you choose, and we disclose that on every shortlist. How we are paid