Project facts
| Address | 399 Boylston ST, Boston, MA 02116 |
|---|---|
| Jurisdiction | City of Boston, MA (Suffolk County) |
| Operator named in the records | Not named. The filer is usually a contractor, engineer or single-purpose company. |
| Furthest step on record | Building permit issued, September 3, 2014 |
| Capacity stated in a filing | None stated |
| Floor area stated | None stated |
| Site area stated | None stated |
| Records on file | 3, from date not stated to date not stated |
Records on file
| Filed | Type and status | What the record says | Source |
|---|---|---|---|
| Issued | Building permit Open | Job #12978 Natixis Floors 4-10 Data Center Decommissioning & Furniture Disconnect Applicant: Brian Murphy | Record |
| Issued | Building permit Open | Job #12978 Natixis Floors 4-10 Data Center Decommissioning & Furniture Disconnect. Deprogram approximately (12) FA Devices. Applicant: Brian Murphy | Record |
| Issued | Building permit Open | Job 11230 - Natixis Data Center 399 Boylston 4th Floor - Install coated conduits for Data Center Applicant: Brian Murphy | Record |
Every row comes from a public permit, air-quality or planning record, linked to its source. A permit shows that work was proposed or approved. It does not show that space is available or that a building is finished. Capacity figures carry the basis the filing gives.
Cite this page
Data Center Scouts, "Data center project at 399 Boylston St, Boston, MA," https://datacenterscouts.com/data-center-projects/massachusetts/399-boylston-st-boston/, updated October 9, 2026. Source records are linked on the page. Journalists and researchers are welcome to use this data with a link back.
All Massachusetts projects · Latest notable filings · Project tracker