Project facts
| Address | 69-75 FARGO ST, South Boston, MA 02127 |
|---|---|
| Jurisdiction | City of Boston, MA (Suffolk County) |
| Operator named in the records | Not named. The filer is usually a contractor, engineer or single-purpose company. |
| Furthest step on record | Building permit issued, December 13, 2012 |
| Capacity stated in a filing | None stated |
| Floor area stated | 24,000 sq ft |
| Site area stated | None stated |
| Records on file | 2, from date not stated to date not stated |
Records on file
| Filed | Type and status | What the record says | Source |
|---|---|---|---|
| Issued | Building permit Closed | installing receptacles for data center Applicant: Paul MacKay | Record |
| Issued | Building permit Open | Installing (2) 2000amp switchboards, UPS system, Geneator, for a new Data center on the 5th floor Applicant: Paul MacKay | Record |
Every row comes from a public permit, air-quality or planning record, linked to its source. A permit shows that work was proposed or approved. It does not show that space is available or that a building is finished. Capacity figures carry the basis the filing gives.
Cite this page
Data Center Scouts, "Data center project at 69-75 Fargo St, South Boston, MA," https://datacenterscouts.com/data-center-projects/massachusetts/69-75-fargo-st-south-boston/, updated October 9, 2026. Source records are linked on the page. Journalists and researchers are welcome to use this data with a link back.