Wholesale data center advisory for tenants and landowners, from 1 MW to campus scale

Massachusetts data center projects

Data center project at 8 Ashburton Pl, Boston, MA

Every public record we hold for this address, newest first, with a link to the original document. Last change on record: date not stated.

Project facts

Address8 Ashburton PL, Boston, MA 02108
JurisdictionCity of Boston, MA (Suffolk County)
Operator named in the recordsNot named. The filer is usually a contractor, engineer or single-purpose company.
Furthest step on recordBuilding permit issued, July 3, 2013
Capacity stated in a filingNone stated
Floor area stated150,000 sq ft
Site area statedNone stated
Records on file3, from date not stated to date not stated

Records on file

FiledType and statusWhat the record saysSource
Issued Building permit
Open
Working in data center upgrading ATC system and low voltage wiring.
Applicant: Julie Keefe
Record
Issued Building permit
Open
Suffolk University - Sawyer Building ( Rooftop ).; Install an additional;Cooling Tower on an existing structural support. The cooling tower will act primarily as backup for the current cooling tower that feeds the Sawyer Data Center.
Applicant: Scott Hale
Record
Issued Building permit
Open
Power wiring for (2) Computer Room Air Condition Units in Suffolk University Sawyer Building Data Center.
Applicant: Paul Guarracino
Record

Every row comes from a public permit, air-quality or planning record, linked to its source. A permit shows that work was proposed or approved. It does not show that space is available or that a building is finished. Capacity figures carry the basis the filing gives.

Cite this page

Data Center Scouts, "Data center project at 8 Ashburton Pl, Boston, MA," https://datacenterscouts.com/data-center-projects/massachusetts/8-ashburton-pl-boston/, updated October 9, 2026. Source records are linked on the page. Journalists and researchers are welcome to use this data with a link back.

All Massachusetts projects · Latest notable filings · Project tracker

Have a requirement measured in megawatts?

Send us the load, the markets and the date you need it energized. A senior advisor replies within one business day with the questions that matter and a plan for the search.

Our advisory is free to tenants. We are compensated by the provider you choose, and we disclose that on every shortlist. How we are paid