Project facts
| Address | 4300 GETWELL RD, MEMPHIS 38118 |
|---|---|
| Jurisdiction | Shelby County, TN (City of Memphis) |
| Operator named in the records | Not named. The filer is usually a contractor, engineer or single-purpose company. |
| Furthest step on record | Operating |
| Capacity stated in a filing | 2.5 MW (Capacity stated in the filing) |
| Floor area stated | None stated |
| Site area stated | None stated |
| Records on file | 5, from date not stated to date not stated |
Capacity wording in the filing: "...phase 1: Initial deployment of 2.5 MW, the plans below describe the site and layout. You will see"
Records on file
| Filed | Type and status | What the record says | Source |
|---|---|---|---|
| Issued | Building permit Building permit issued | This permit is only for the accessory structures located on the exterior of the building. A separate permit has been filed for the interior. Phase III of existing Data Center. See attached plans for a detailed scope of work. | Record |
| Issued | Building permit Building permit issued | Interior scope of work for Phase III of a new data center. | Record |
| Issued | Building permit Building permit issued | All reviews completed under COM-ACC-25-000051. This 2nd permit is only needed to final per Kevin Dulin. Datacenter phase 1: Initial deployment of 2.5 MW, the plans below describe the site and layout. You will see attached the electrical, mechanical, architectural, structural, civil and fire protection plans for the site. INSTALLING WALLS, ECT. | Record |
| Issued | Building permit Building permit issued | Project: Building a Data Center - Phase 1 The first phase of the data center project focuses on the initial deployment of 2.5 MW of capacity. This phase includes the construction of essential infrastructure to support future scalability. The submitted plans provide detailed layouts covering electrical, mechanical, architectural, structural, civil, and fire protection systems. Scope of Work: Structural & Architectural: Installation of walls, partitions, and building enclosures to define critical spaces. Electrical: Deployment of power distribution systems, transformers, switchgear, and backup power solutions. Mechanical: Implementation of HVAC, cooling systems, and ventilation to support server operations. Fire Protection: Installation of fire suppression and alarm systems per safety regulations. Civil Work: Site preparation, grading, and utility connections. This phase lays the foundation for future expansion and full-scale operation, ensuring compliance with building codes and industr | Record |
| Not stated | Air permit Operating | 5C MEM01 INC | Record |
Every row comes from a public permit, air-quality or planning record, linked to its source. A permit shows that work was proposed or approved. It does not show that space is available or that a building is finished. Capacity figures carry the basis the filing gives.
Cite this page
Data Center Scouts, "Data center project at 4300 Getwell Rd, Memphis, TN," https://datacenterscouts.com/data-center-projects/tennessee/4300-getwell-rd-memphis/, updated October 9, 2026. Source records are linked on the page. Journalists and researchers are welcome to use this data with a link back.