Project facts

Address4300 GETWELL RD, MEMPHIS 38118
JurisdictionShelby County, TN (City of Memphis)
Operator named in the recordsNot named. The filer is usually a contractor, engineer or single-purpose company.
Furthest step on recordOperating
Capacity stated in a filing2.5 MW (Capacity stated in the filing)
Floor area statedNone stated
Site area statedNone stated
Records on file5, from date not stated to date not stated

Capacity wording in the filing: "...phase 1: Initial deployment of 2.5 MW, the plans below describe the site and layout. You will see"

Records on file

FiledType and statusWhat the record saysSource
Issued Building permit
Building permit issued
This permit is only for the accessory structures located on the exterior of the building. A separate permit has been filed for the interior. Phase III of existing Data Center. See attached plans for a detailed scope of work.Record
Issued Building permit
Building permit issued
Interior scope of work for Phase III of a new data center.Record
Issued Building permit
Building permit issued
All reviews completed under COM-ACC-25-000051. This 2nd permit is only needed to final per Kevin Dulin. Datacenter phase 1: Initial deployment of 2.5 MW, the plans below describe the site and layout. You will see attached the electrical, mechanical, architectural, structural, civil and fire protection plans for the site. INSTALLING WALLS, ECT.Record
Issued Building permit
Building permit issued
Project: Building a Data Center - Phase 1 The first phase of the data center project focuses on the initial deployment of 2.5 MW of capacity. This phase includes the construction of essential infrastructure to support future scalability. The submitted plans provide detailed layouts covering electrical, mechanical, architectural, structural, civil, and fire protection systems. Scope of Work: Structural & Architectural: Installation of walls, partitions, and building enclosures to define critical spaces. Electrical: Deployment of power distribution systems, transformers, switchgear, and backup power solutions. Mechanical: Implementation of HVAC, cooling systems, and ventilation to support server operations. Fire Protection: Installation of fire suppression and alarm systems per safety regulations. Civil Work: Site preparation, grading, and utility connections. This phase lays the foundation for future expansion and full-scale operation, ensuring compliance with building codes and industrRecord
Not statedAir permit
Operating
5C MEM01 INCRecord

Every row comes from a public permit, air-quality or planning record, linked to its source. A permit shows that work was proposed or approved. It does not show that space is available or that a building is finished. Capacity figures carry the basis the filing gives.

Cite this page

Data Center Scouts, "Data center project at 4300 Getwell Rd, Memphis, TN," https://datacenterscouts.com/data-center-projects/tennessee/4300-getwell-rd-memphis/, updated October 9, 2026. Source records are linked on the page. Journalists and researchers are welcome to use this data with a link back.

All Tennessee projects · Latest notable filings · Project tracker

Have a requirement measured in megawatts?

Send us the load, the markets and the date you need it energized. A senior advisor replies within one business day with the questions that matter and a plan for the search.

Our advisory is free to tenants. We are compensated by the provider you choose, and we disclose that on every shortlist. How we are paid