Data center project at 1023 39th Ave SE, Puyallup, WA

Every public record we hold for this address, newest first, with a link to the original document. Last change on record: date not stated.

Project facts

Address1023 39th Ave SE, Puyallup, WA 98374
JurisdictionWashington (statewide, SEPA Register)
Operator named in the recordsNot named. The filer is usually a contractor, engineer or single-purpose company.
Furthest step on recordZoning or planning review, February 15, 2024
Capacity stated in a filing5 MW (Estimated from a generator count, low confidence)
Floor area statedNone stated
Site area statedNone stated
Records on file1, from date not stated to date not stated

Records on file

FiledType and statusWhat the record saysSource
Issued Zoning
ODNS/NOA-M
CENTERIS VOLTAGE PARK INFRASTRUCTURE UPGRADES
Applicant: Leonard Ruff
Record

Every row comes from a public permit, air-quality or planning record, linked to its source. A permit shows that work was proposed or approved. It does not show that space is available or that a building is finished. Capacity figures carry the basis the filing gives.

Cite this page

Data Center Scouts, "Data center project at 1023 39th Ave SE, Puyallup, WA," https://datacenterscouts.com/data-center-projects/washington/1023-39th-ave-se-puyallup/, updated October 9, 2026. Source records are linked on the page. Journalists and researchers are welcome to use this data with a link back.

All Washington projects · Latest notable filings · Project tracker

Have a requirement measured in megawatts?

Send us the load, the markets and the date you need it energized. A senior advisor replies within one business day with the questions that matter and a plan for the search.

Our advisory is free to tenants. We are compensated by the provider you choose, and we disclose that on every shortlist. How we are paid