Washington data center projects

Microsoft data center at 875 C Urban Industrial Way Ste #201 East Wenatchee, Wenatchee, WA

Every public record we hold for this address, newest first, with a link to the original document. Last change on record: date not stated.

Project facts

Address875 C URBAN INDUSTRIAL WAY STE #201 EAST WENATCHEE, WENATCHEE, WA 98802
JurisdictionWashington (statewide, SEPA Register)
Operator named in the recordsMicrosoft
Furthest step on recordZoning or planning review, June 6, 2023
Capacity stated in a filingNone stated
Floor area stated245,000 sq ft
Site area statedNone stated
Records on file1, from date not stated to date not stated

Records on file

FiledType and statusWhat the record saysSource
Issued Zoning
ODNS
BPC-2023-004 Microsoft Building CRecord

Every row comes from a public permit, air-quality or planning record, linked to its source. A permit shows that work was proposed or approved. It does not show that space is available or that a building is finished. Capacity figures carry the basis the filing gives.

Cite this page

Data Center Scouts, "Microsoft data center at 875 C Urban Industrial Way Ste #201 East Wenatchee, Wenatchee, WA," https://datacenterscouts.com/data-center-projects/washington/875-c-urban-industrial-way-ste-201-east-wenatchee-wenatchee/, updated October 9, 2026. Source records are linked on the page. Journalists and researchers are welcome to use this data with a link back.

All Washington projects · Latest notable filings · Project tracker

Have a requirement measured in megawatts?

Send us the load, the markets and the date you need it energized. A senior advisor replies within one business day with the questions that matter and a plan for the search.

Our advisory is free to tenants. We are compensated by the provider you choose, and we disclose that on every shortlist. How we are paid